Oita steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed map
- Participation
- Steel plant overview
- Key raw materials rates
- Downstream products
- Finished steel production
- Production table (Mt)
- Capital costs
- Total operating cash costs - Finished steel
- Operating cash costs table
What's included
This report contains:
Other reports you may be interested in
PETRONAS FLNG 1 - Commercial overview
PFLNG 1 was the first floating facility in Malaysia, initially moored 180 kilometres offshore Sarawak and received gas from the Kanowit ...
$2,700Sengkang LNG - Commercial overview
Sengkang LNG was a small-scale, modular liquefaction plant that was proposed by Energy World Corporation (EWC). The proposed facility ...
$2,700Arun LNG - Ceased - Commercial Overview
The Arun LNG plant is located at Blang Lancang in North Sumatra. Due to the lack of material backfill options and the decline from the ...
$2,700