Asset report

Olinghouse (Closed) gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Mining began in July 1998. Production of gold from the initial shakedown run of the mill began in September 1998 and from the leach pad in December 1998. On 6th August 1999 mining was suspended due to liquidity problems. Four out of the six leases to be mined are subject to NSR royalties of 4 6%. Additionally minimum lease payments of approximately $0.45M/a are payable. Capital cost was $25M.

What's included

This report contains

  • Document

    Olinghouse (Closed) gold mine

    XLS 117.00 KB

  • Document

    Olinghouse (Closed) gold mine

    PDF 608.33 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898