Asset Report

Olympias gold mine project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

A three-phase development programme has been adopted to allow refurbishment and construction of required infrastructure. Phase I from 2012 to 2016 involved tailings treatment and refurbishment to the underground mine. Phase II (2017-2025) will be underground mining at a rate of 400kt/a with  annual average gold production of 85koz. The final products will be separate Pb/Ag, Zn and AsPyAu concentrates. Phase III from 2025 up to at least 2040 consists of underground mining, initially around the existing shaft and other infrastructure. Production will ramp up progressively to 800kt/a through the expansion of underground infrastructure, which includes a new 8.5km decline from the base of the Olympias deposit for conveying the ore to a new centralised concentrator in the Stratoni Valley.

What's included

This report contains

  • Document

    Olympias Project gold mine

    XLS 140.50 KB

  • Document

    Olympias gold mine

    PDF 988.43 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898