Onca-Puma nickel operation
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Emissions
 - Mining
 - Process
 - Cashflow
 
Tables and charts
This report includes the following images and tables:
- Onca-Puma Emission Intensity Quartile Ranking - total global production - tonnes Ni equivalent
 - Detailed map
 
What's included
This report contains:
Other reports you may be interested in
PT Huadi Nickel Alloy nickel operation
Cost analysis for PT Huadi Nickel-Alloy Indonesia (PT HNI) operation
$2,250Lockerby closed nickel operation
A detailed analysis of the Lockerby nickel operation.
$2,250KGHM Sudbury nickel operation
A detailed analysis of the KGHM nickel operation.
$2,250