Asset Report
Palabora copper smelter
Report summary
The Palabora smelter was commissioned in 1966 as a conventional green feed reverberatory furnace smelter. In 1987 a Contop cyclone smelting unit was added to the reverberatory furnace to increase its smelting capacity, which had previously limited copper production capacity. Problems in commissioning the Contop unit resulted in reduced overall smelting capacity and the Contop unit was removed from service in August 1990. A major upgrade project was completed during 1993 involving three new...
Table of contents
- Flowsheet
- Feed preparation
- Smelting process
- Auxiliary plants
- Environmental
- Production
- Products allocation
Tables and charts
This report includes 7 images and tables including:
What's included
This report contains:
Other reports you may be interested in
14 April 2022
Palabora copper mine
Asset Report
Palabora copper mine
A detailed analysis of the Palabora copper mine.
$2,25018 November 2022
Caletones copper smelter
Asset Report
Caletones copper smelter
A detailed analysis of the Caletones copper smelter.
$2,25029 June 2022
Chuquicamata copper minesite
Asset Report
Chuquicamata copper minesite
A detailed production, commercial and cost competitive analysis of the Chuquicamata copper minesite.
$2,250