Asset Report
Paragsha (Cerro de Pasco) zinc mine
Report summary
In 2018, Paragsha was comprised of an underground Pb-Zn mine, the 2.5kt/d San Expedito concentrator and the 2.5kt/d ore cyanidation project to leach silver oxide ores. Since the latter is an independent circuit of the Pb-Zn operation this is not included in the accompanying analysis. The 2018 accompanying analysis includeed only the stockpile resources of Pb-Zn that was being treated in Paragasha/San Expedito, that is, 2.2Mt ore with 2.04%Zn, 0.47%Pb, 0.01%Cu and 15.86g/t Ag. We expect this to last until 2020.
Table of contents
- Summary
- Key issues
- Emissions
- Sulfide reserves
- Oxide reserves
- Mining
- Processing
- Operating
- CAPEX
- Royalties and taxes
Tables and charts
This report includes 2 images and tables including:
- Paragsha Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Huaron zinc mine
A detailed production, commercial and cost competitive analysis of the Huaron zinc mine.
$2,250
Asset Report
Yauliyacu (Casapalca) zinc mine
A detailed analysis of the Yauliyacu (Casapalca) zinc mine.
$2,250
Asset Report
Vinchos (closed) zinc mine
A detailed analysis along the production and commercialisation chain of the Vinchos zinc mine.
$2,250