The Parcoy unit operates a cut and fill underground vein gold mine and a flotation and cyanidation plant with a daily throughput of 2.1kt/d. The processing plant is located in the Retamas town at 2750 level and all mine veins and stopes are located below the 2750 level (equivalent to meters above the sea level). The usual grade treated in this unit is around 10g/t Au. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.