Asset Report

Pasar copper smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The smelter was commissioned in 1983 as part of the Pasar project, which also involved a refinery and a precious metals plant producing doré metal. The total cost of the project was US$390M. An expansion project commenced in 1991 to increase the smelter capacity from 138kt/a copper to 172kt/a copper. The project involved an additional oxygen plant, modifications to the concentrate burners and waste heat boiler, replacement of cyclones with a dust chamber and the addition of a third...

Table of contents

  • Summary
  • Key issues
  • Feed preparation
  • Smelting process
  • Auxiliary plants

Tables and charts

This report includes 6 images and tables including:

  • Pasar Emission Intensity Quartile ranking - total global production - tonnes Cu
  • Detailed map
  • Flowsheet

What's included

This report contains:

  • Document

    Pasar copper smelter

    PDF 1.62 MB

  • Document

    Pasar copper smelter

    ZIP 1.17 MB