Asset Report
Pasar copper smelter
Report summary
The smelter was commissioned in 1983 as part of the Pasar project, which also involved a refinery and a precious metals plant producing doré metal. The total cost of the project was US$390M. An expansion project commenced in 1991 to increase the smelter capacity from 138kt/a copper to 172kt/a copper. The project involved an additional oxygen plant, modifications to the concentrate burners and waste heat boiler, replacement of cyclones with a dust chamber and the addition of a third...