Asset report

Pasar copper smelter

From

$1,350.00

You can pay by card or invoice

Get this report

From

$1,350.00

You can pay by card or invoice

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The smelter was commissioned in 1983 as part of the Pasar project, which also involved a refinery and a precious metals plant producing doré metal. The total cost of the project was US$390M. An expansion project commenced in 1991 to increase the smelter capacity from 138kt/a copper to 172kt/a copper. The project involved an additional oxygen plant, modifications to the concentrate burners and waste heat boiler, replacement of cyclones with a dust chamber and the addition of a third...

What's included

This report contains

  • Document

    Pasar copper smelter.xls

    XLS 481.00 KB

  • Document

    Pasar copper smelter

    PDF 563.49 KB

Table of contents

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Costs: Image 1
  • Products: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 1
  • Products allocation

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898