Asset report

Pasar copper smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The smelter was commissioned in 1983 as part of the Pasar project which also involved a refinery and a precious metals plant producing doré metal. The total cost of the project was US$390M. An expansion project commenced in 1991 to increase the smelter capacity from 138kt/a copper to 172kt/a copper. The project involved an additional oxygen plant modifications to the concentrate burners and waste heat boiler replacement of cyclones with a dust chamber and the addition of a third...

What's included

This report contains

  • Document

    Pasar copper smelter.xls

    XLS 481.50 KB

  • Document

    Pasar copper smelter

    PDF 564.09 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Costs: Image 1
  • Products: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 1
  • Products allocation

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898