Asset report

Pasar copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The smelter was commissioned in 1983 as part of the Pasar project, which also involved a refinery and a precious metals plant producing doré metal. The total cost of the project was US$390M. An expansion project commenced in 1991 to increase the smelter capacity from 138kt/a copper to 172kt/a copper. The project involved an additional oxygen plant, modifications to the concentrate burners and waste heat boiler, replacement of cyclones with a dust chamber and the addition of a third...

What's included

This report contains

  • Document

    Pasar copper smelter.xls

    XLS 481.50 KB

  • Document

    Pasar copper smelter

    PDF 563.48 KB

Table of contents

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Costs: Image 1
  • Products: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 1
  • Products allocation

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898