Asset report

Perama gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Perama will be an open pit operation ustilising conventional mining methods. Processing will comprise a three stage crushing circuit and ball mill operating in a closed circuit with hydrocyclones together with a conventional 1.25Mt/a CIL mill. The project was placed on care and maintenance in January 2016.

What's included

This report contains

  • Document

    Perama gold mine project

    XLS 124.50 KB

  • Document

    Perama gold mine project

    PDF 978.00 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Geology
    • Mining
    • The accompanying analysis assumes conventional open pit mining, carried out by the mine owners. The final pit size is expected to be 750m long and 150-400m wide with a strip ratio of 0.4:1 over a mine life of 9 years.
    • Processing
    • CAPEX
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898