Asset Report

Bellevue gold mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Bellevue Gold Project, located 400km north west of Kalgoorlie in Western Australia, is a high-grade underground operation that is currently under development. The project is owned by Bellevue Gold Limited and has released a Stage 2 Feasibility Study (FS2) in September 2021. FS2 underpins an initial 8.1 years of mine life, with a 1Mtpa processing plant, using a conventional gravity and leaching circuit to recover gold. The FS2 is an update to the Stage 1 Feasibility Study reported in February 2021, and is based on increased Indicated Resource of 1.4Moz and higher throughput rate of 1Mtpa (Stage One: 1.0Moz and 750ktpa).

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Processing
  • Infrastructure
  • Power
  • Water
  • Capex

Tables and charts

This report includes the following images and tables:

  • Detailed Map

What's included

This report contains:

  • Document

    Bellevue gold mine project

    PDF 1.11 MB