Asset Report
Pering (Closed) zinc mine
Report summary
The mine closed down in 2003. There is a possibility that the mine could be re-opened and this restart is analysed seperately as the Pering Restart. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Brunswick (Closed) zinc mine
A detailed analysis of the Brunswick zinc mine.
$2,250
Asset Report
Hellyer Mine Restart (Closed) zinc mine
A detailed analysis of the Hellyer Mine Restart zinc mine.
$2,250
Asset Report
Duck Pond (closed) zinc mine
A detailed analysis of the Duck Pond zinc mine.
$2,250