Asset Report
Pioneer gold mine
Report summary
Pioneer has transitioned from an open pit operation utilising conventional truck and shovel mining methods to a combined open pit and underground operation with development of the North East Bakhmut and Andreevskaya underground mines. Higher grade material is processed at an on-site 6.7Mt/a resin-in-pulp (RIP) plant whilst low grade material was processed by heap leaching, typically between April to November. Heap leaching ceased in 2018 with residual leaching continuing into 2019.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains: