Asset Report

Pioneer gold mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Pioneer has transitioned from an open pit operation utilising conventional truck and shovel mining methods to a combined open pit and underground operation with development of the North East Bakhmut and Andreevskaya underground mines. Higher grade material is processed at an on-site 6.7Mt/a resin-in-pulp (RIP) plant whilst low grade material was processed by heap leaching, typically between April to November. Heap leaching ceased in 2018 with residual leaching continuing into 2019.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes the following images and tables:

  • Detailed map

What's included

This report contains:

  • Document

    Pioneer gold mine

    XLS 136.00 KB

  • Document

    Pioneer gold mine

    PDF 1.17 MB