Asset Report
Pobuzhsky nickel operation
Report summary
Prior to its acquisition by Solway in 2003, Pobuzhsky (built in 1972) had been under receivership and idle for more than 3 years due to unprofitable processing of low-grade nickel ore from the local open pits. Solway entered into long-term partnerships with suppliers of high-grade nickel ore from Indonesia and New Caledonia and metal trading companies in Europe. Within a year of new management the plant was relaunched and two modernized 33 MW electric furnaces became operational. As a result of these measures the total processing capacity of the plant reached 1.5Mt/a.
Table of contents
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Nickel Pig Iron RKEF nickel operation
A detailed analysis of the Nickel Pig Iron RKEF nickel operation.
$2,250
Asset Report
Pomalaa nickel operation
A detailed analysis of the Pomalaa nickel operation.
$2,250
Asset Report
Leinster nickel operation
A detailed analysis of the Leinster nickel operation.
$2,250