Asset Report
Red Dome (Closed) gold mine
Report summary
The operation closed in 1997. A total of US$5.2M was expensed on environmental activities since Niugini Mining acquired Red Dome in 1991. Full environmental statutory compliance was achieved at all levels across the mine site in 1997. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Dome Mountain (Closed) gold mine
A detailed analysis of the Dome Mountain (Closed) gold mine.
$2,250
Asset Report
Dona Lake (Closed) gold mine
A detailed analysis of the Dona Lake (Closed) gold mine.
$2,250
Asset Report
Can Can (Closed) gold mine
A detailed analysis of the Can Can (Closed) gold mine.
$2,250