Asset Report

Reko Diq copper mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Reko Diq is a copper-gold project in NW Pakistan near the borders of Afghanistan and Iran. Under the 2010 feasilbility study, the project was planned as an open-pit mining operation with ore processing by flotation in a 110kt/d plant and estimated mine life of 56 years with average annual production of ~200kt of copper and ~250koz of gold in copper concentrate. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset

Table of contents

  • Summary
    • Pipeline
  • CAPEX
  • Mining
  • Processing
  • Royalties

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Reko Diq copper mine project

    PDF 1.11 MB