Asset Report

Reward - Highway copper mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Reward - Highway copper mine operated between 1998 and 2005 and comprised the Highway and Reward open pit copper mines, the Reward Deeps underground copper mine and exploration activities within the surrounding project tenements. Mined ore was trucked approximately 100km for processing at a conventional crushing/flotation concentrator at the Thalanga mill. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • CAPEX
  • Mining
  • Process

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Reward - Highway copper mine

    XLS 349.00 KB

  • Document

    Reward - Highway copper mine

    PDF 1.07 MB