Asset Report

Rio Blanco gold mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Junefield was planning to develop a mine-mill project of 800t/d ore (240kt/a). Mining will be done using underground mining methods and the processing plant is expected to follow a gravimetric, flotation and cyanidation process. A gravimetric concentrate, a flotation concentrate and a cyanidation cement are thought to be the saleable commercial products. The project is located to more than 3.5km away from the Cajas National Reserve and at an altitude of 3,900 m.a.s.l. and because of this the project faced significant opposition. In 2018 the project was stopped.

Table of contents

  • Summary
  • Key issues
  • CAPEX
  • Operating
  • Mining
  • Processing
  • Power
  • Water
  • Royalties and taxes
  • Permitting
  • Community relations
  • Environmental reclamation

Tables and charts

This report includes 1 images and tables including:

What's included

This report contains:

  • Document

    Rio Blanco gold mine project

    XLS 112.50 KB

  • Document

    Rio Blanco gold mine project

    PDF 1.21 MB