Asset Report

Ronnskar copper smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Ronnskar copper smelter was commissioned in 1930 to treat concentrates from the company's own mines.  A lead smelter was constructed on the same site in 1943. Currently the primary lead smelting is undertaken in a TBRC that is also used in campaigns for burning and melting plastic insulated copper scrap.  An allowance for the use of the TBRC is included in the copper analysis given here.  Similarly, the slag fuming furnace is operated primarily for the recovery of zinc, ~10% of which...

What's included

This report contains

  • Document

    Ronnskar copper smelter

    PDF 655.57 KB

  • Document

    Ronnskar copper smelter.xls

    XLS 480.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898