Asset Report

Ronnskar copper smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

04 June 2018

Ronnskar copper smelter

Report summary

The Ronnskar copper smelter was commissioned in 1930 to treat concentrates from the company's own mines.  A lead smelter was constructed on the same site in 1943. Currently the primary lead smelting is undertaken in a TBRC that is also used in campaigns for burning and melting plastic insulated copper scrap.  An allowance for the use of the TBRC is included in the copper analysis given here.  Similarly, the slag fuming furnace is operated primarily for the recovery of zinc, ~10% of which...

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Flowsheet
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Production
  • Products: Table 1
  • Products allocation
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Ronnskar copper smelter

    PDF 1.08 MB

  • Document

    Ronnskar copper smelter.xls

    XLS 413.50 KB

Other reports you may be interested in

Browse reports by Industry Sector