Asset Report

Ronnskar copper smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Ronnskar copper smelter was commissioned in 1930 to treat concentrates from the company's own mines. A lead smelter was constructed on the same site in 1943. Currently the primary lead smelting is undertaken in a TBRC that is also used in campaigns for burning and melting plastic insulated copper scrap. An allowance for the use of the TBRC is included in the copper analysis given here. Similarly, the slag fuming furnace is operated primarily for the recovery of zinc, ~10% of which...

Table of contents

  • Emissions
  • Environmental

Tables and charts

This report includes 6 images and tables including:

  • Ronnskar Emission Intensity Quartile ranking - total global production - tonnes Cu
  • Detailed map
  • Flowsheet
  • Feed preparation
  • Smelting process
  • Auxiliary plants

What's included

This report contains:

  • Document

    Ronnskar copper smelter

    PDF 1.60 MB

  • Document

    Ronnskar copper smelter

    ZIP 1.20 MB