Asset Report

San Luis Potosi zinc smelter

Get this report

$1,350

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

San Luis Potosi zinc smelter

Report summary

The San Luis Potosi smelter was commissioned in November 1982 at a cost of US$200M.  The planned capacity was 113kt/a zinc but as the roasting capacity was only equivalent to 90kt/a zinc, the balance of the production was expected to be obtained from leaching oxide fume.  The required tonnage of oxide fume was not available and the capacity of the plant was therefore roaster limited at around 95kt/a zinc.  Oxide fume from Chihuahua lead smelter was, until its closure in 1993, leached in a...

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Projects
  • Products
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Flowsheet

What's included

This report contains:

  • Document

    San Luis Potosi zinc smelter

    PDF 696.43 KB

  • Document

    San Luis Potosi zinc smelter.xls

    XLS 534.00 KB

Other reports you may be interested in

Browse reports by Industry Sector