Report summary

The San Luis Potosi smelter was commissioned in November 1982 at a cost of US$200M. The planned capacity was 113kt/a zinc but as the roasting capacity was only equivalent to 90kt/a zinc the balance of the production was expected to be obtained from leaching oxide fume. The required tonnage of oxide fume was not available and the capacity of the plant was therefore roaster limited at around 95kt/a zinc. Oxide fume from Chihuahua lead smelter was until its closure in 1993 leached in a...

What's included

This report contains

  • Document

    San Luis Potosi zinc smelter

    PDF 696.56 KB

  • Document

    San Luis Potosi zinc smelter.xls

    XLS 538.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Projects
  • Products
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898