The San Luis Potosi smelter was commissioned in November 1982 at a cost of US$200M.  The planned capacity was 113kt/a zinc but as the roasting capacity was only equivalent to 90kt/a zinc, the balance of the production was expected to be obtained from leaching oxide fume.  The required tonnage of oxide fume was not available and the capacity of the plant was therefore roaster limited at around 95kt/a zinc.  Oxide fume from Chihuahua lead smelter was, until its closure in 1993, leached in a...

What's included?

This report includes 2 file(s)

  • San Luis Potosi zinc smelter PDF - 696.50 KB 7 Pages, 1 Tables, 2 Figures
  • San Luis Potosi zinc smelter.xls XLS - 538.50 KB

Description

This Zinc Metals Smelter report provides a detailed analysis of the cost profile, process overview, products and key issues for this asset, as well as a detailed location map.

For zinc producers, advisors and financial companies, this report provides an understanding of the value and efficiency of the operation. Use this report to understand the competitive position, identify acquisition opportunities and strengthen business strategies.

Wood Mackenzie's cost methodology is the established global industry standard, relied on by the world’s leading investment banks and mining companies to make strategic, operational and investment decisions.

Our analysts are based in the markets they analyse, working with high-quality proprietary cost databases and cost curve analyses to write consistent and reliable insights. Our database includes over 2,450 asset analyses covering more than 1,000 companies worldwide.

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Projects
  • Products
  • Economic assumptions

In this report there are 3 tables or charts, including:

  • Key facts
    • Key facts: Table 1
  • Summary and key issues
  • Location maps
    • Location maps: Image 1
  • Process overview
    • Flowsheet
  • Projects
  • Products
  • Economic assumptions
Requester's name : .............
Department : .............
Authoriser's Name : .............
Authoriser's signature : .............
Date : .............
Cost Centre : .............

Questions about this report?

Frequently Asked Questions

Mailenquiries@woodmac.com
  • Europe: +44 131 243 4699
  • Americas: +1 713 470 1900
  • Asia Pacific: +61 2 8224 8898
contact us

Why Wood Mackenzie?

As the trusted source of commercial intelligence for the world's natural resources sector for more than 40 years, we empower clients to make better strategic decisions with objective analysis and advice. Find out more...