The San Luis Potosi smelter was commissioned in November 1982 at a cost of US$200M. The planned capacity was 113kt/a zinc but as the roasting capacity was only equivalent to 90kt/a zinc, the balance of the production was expected to be obtained from leaching oxide fume. The required tonnage of oxide fume was not available and the capacity of the plant was therefore roaster limited at around 95kt/a zinc. Oxide fume from Chihuahua lead smelter was, until its closure in 1993, leached in a...

Table of contents

  • Summary:
    • Emissions
    • 2020
    • 2019
    • 2000-2009
    • 1990-1999
    • 1980-1989

Tables and charts

This report includes 7 images and tables including:

  • San Luis Potosi zinc smelter Emission Intensity Quartile ranking – total global production - tonnes Zn
  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    San Luis Potosi zinc smelter

    PDF 1.71 MB

  • Document

    San Luis Potosi zinc smelter

    ZIP 1.25 MB