San Luis Potosi zinc smelter
Report summary
The San Luis Potosi smelter was commissioned in November 1982 at a cost of US$200M. The planned capacity was 113kt/a zinc but as the roasting capacity was only equivalent to 90kt/a zinc, the balance of the production was expected to be obtained from leaching oxide fume. The required tonnage of oxide fume was not available and the capacity of the plant was therefore roaster limited at around 95kt/a zinc. Oxide fume from Chihuahua lead smelter was, until its closure in 1993, leached in a...
Table of contents
- Summary:
-
Key issues:
- Emissions
- 2020
- 2019
- 2000-2009
- 1990-1999
- 1980-1989
Tables and charts
This report includes 7 images and tables including:
- San Luis Potosi zinc smelter Emission Intensity Quartile ranking – total global production - Tonnes Zn
- Detailed map
- Flowsheet
- Feed Preparation
- Roaster and Acid Plant
- Leaching and Purification
- Tankhouse, Melting and Casting
What's included
This report contains:
Other reports you may be interested in
Asset Report
San Luis Potosi (closed) copper smelter
A detailed analysis of the San Luis Potosi copper smelter.
$2,250
Asset Report
San Juan de Nieva zinc smelter
A detailed analysis of the San Juan de Nieva zinc smelter.
$2,250
Asset Report
Valleyfield zinc smelter
A detailed analysis of the Valleyfield zinc smelter.
$2,250