Asset Report
Santander zinc mine
Report summary
The Santander consists of the Santander tailings and the Magistral North, Magistral Centre and Magistral South carbonate replacement Ag-Pb-Zn deposits. The operation is comprised of an underground mine and 2kt/d processing plant producing lead and zinc concentrates. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
-
Processing
- Power
- Operating
- CAPEX
- Royalties and taxes
Tables and charts
This report includes 3 images and tables including:
- Santander Emission Intensity Quartile ranking – Total global production - Tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Zinkgruvan (Ammeberg) zinc mine
A detailed analysis of the Zinkgruvan (Ammeberg) zinc mine.
$2,250
Asset Report
Pine Point zinc mine project
A detailed analysis of the Pine Point zinc mine project.
$2,250
Asset Report
Kihabe-Nxuu zinc mine project
A detailed analysis of the Kihabe-Nxuu zinc mine project.
$2,250