Shagang (BOF) steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital cost
- Operating cash costs
Tables and charts
This report includes 11 images and tables including:
- Detailed map
- Participation
- Steel plant overview
- Key raw material rates
- Downstream products
- Finished steel production
- Production table(Mt)
- Capital cost
- Total operating cash costs: finished steel
- Operating cash cost table
What's included
This report contains:
Other reports you may be interested in
Shagang (EAF) steel plant
A detailed analysis of the Shagang (EAF) steel plant.
$2,250Cilegon (BOF) steel plant
POSCO PT Krakatau JV plans to double its BF-BOF production capacity before 2030.
$2,250Meishan steel plant
Meishan Iron and Steel is an HRC producer controlled by Baowu Steel Group after Baosteel Group and Wuhan Iron and Steel merged in 2016.
$2,250