Shagang (EAF) steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Capital cost
- Operating cash costs
Tables and charts
This report includes the following images and tables:
-
Detailed mapParticipationSteel plant overview
-
Key raw material ratesDownstream productsFinished steel productionProduction table (Mt)Capital CostTotal operating cash costs: finished steelOperating cash cost table
What's included
This report contains:
Other reports you may be interested in
Cartagena (Escombreras) zinc smelter project
A detailed analysis of the Cartagena (Escombreras) zinc smelter project.
$2,250Shaoguan zinc smelter project
A detailed analysis of the Shaoguan zinc smelter project.
$2,250Monaca (Electrothermic) zinc smelter
A detailed analysis of the Monaca (Electrothermic) zinc smelter.
$2,250