Asset report

Shangluo zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Shangluo smelter was commissioned in late 199 0 with a capacity of 8 kt/a. In 2001 the zinc capacity was upgraded to 30kt/a and was further expanded to 50kt/a in 2006. In 2009 zinc capacity was raised to 150kt/a and in 2014 capacity was raised to 200kt/a slab zinc.

What's included

This report contains

  • Document

    Shangluo zinc smelter

    PDF 799.23 KB

  • Document

    Shangluo zinc smelter.xls

    XLS 528.50 KB

Table of contents

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

Asset report

Jiama gold mine

Asset report

Dexing gold mine

Asset report

Penjom gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898