Asset report

SLN Complex-Doniambo nickel operation

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Doniambo's nickel output is split 80% ferronickel and 20% matte for conversion at the Sandouville refinery into high purity nickel metal and salts of nickel and cobalt. Eramet launched an investment programme in 2003 aimed at increasing production capacity up to 75 000 tonnes of nickel per year. This programme involved the building of a new furnace at the Doniambo smelter the extension of the Tiébaghi mine in New Caledonia and the revamping of four rotary kiln furnaces. In 2016 with nickel prices still low Eramet stated its intention to reduce operating costs at Doniambo to $4.50/lb by the end of 2017. This objective was stated as an absolute priority to be achieved through various measures to be implemented throughout the production chain from mine planning and operational changes at Doniambo and a move to third party matte refining at Sandouville.

What's included

This report contains

  • Document

    SLN Complex-Doniambo nickel operation

    PDF 372.76 KB

  • Document

    SLN Complex-Doniambo nickel operation flowsheet

    PDF 74.39 KB

  • Document

    MboNi.xls

    XLS 830.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Production
  • Costs
  • Timeline

Tables and charts

This report includes 8 images and tables including:

Images

  • Location maps: Image 1
  • Production: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Cashflow

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898