Asset Report

Stibnite gold mine project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

06 December 2018

Stibnite gold mine project

Report summary

The property is owned and operated by Midas Gold and comprises three main in-situ deposits (Hangar Flats, West End and Yellow Pine) and onsite historic tailings which all contain oxide and sulphide ore. The operation is planned to produce 4Moz of gold along with silver and antimony over 12 years. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

What's included

This report contains:

  • Document

    Stibnite gold mine project

    XLS 116.50 KB

  • Document

    Stibnite gold mine project

    PDF 1005.48 KB

  • Document

    Stibnite gold mine project

    ZIP 968.96 KB

Trusted by leading organisations