Asset report

Tasiast gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Tasiast is a conventional open pit mine which commenced production in 2008. Lower grade ore is processed via heap leaching whilst higher grade ore is processed via three stage crushing ball milling and a carbon in leach circuit. Kinross completed a feasibility study on a mill expansion programme in 2014 but the development of the 38kt/d expansion has been indefinitely postponed owing to the difficult price environment. Plans as of 2016 include a two phase expansion from current capacity of 8Kt/a to 30Kt/d by 2020.

What's included

This report contains

  • Document

    Tasiast gold mine

    PDF 1.13 MB

  • Document

    Tasiast gold mine.xls

    XLS 350.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
  • Operations
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Location maps: Image 1
  • Production
  • Cash costs
  • 30Kt/d process flowsheet

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production
  • Capital costs (US$ million)
  • Cash costs (US$/oz)
  • Economic assumptions: Table 1
  • Operations

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898