Asset report

Telfer gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Telfer was the flagship asset of Newcrest at the company's formation in 1990. The original gold mining operations were suspended in September 2000 due to high costs having produced 6 Moz of gold. A subsequent drilling program in the area showed that the grade of the deposit had previously been under estimated and approval was given for an expansion program. Commissioning of an expanded open pit copper and gold operation started in November 2004 with start up officially announced on...

What's included

This report contains

  • Document

    Telfer gold mine

    XLS 140.50 KB

  • Document

    Telfer gold mine

    PDF 420.30 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Production
  • Operations
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898