Three hot issues from recent field trips in China
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- 1. What has been the impact of the high copper price for semis manufacturers over the past few months?
- 2. An update on the situation in the copper downstream sector since the new scrap policy came into place in November 2020
- 3. What is the impact of SRB copper stock releases?
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
ZLNG (Petronas FLNG 3) - Commercial Overview
Petronas FLNG 3, or ZLNG, is an under-construction floating facility in the Sabah region.
$2,700Blocks 04/36 and 05/36
Blocks 04/36 and 05/36, in the shallow waters of the Bohai Bay, are two of a handful of upstream PSCs offshore China.
$3,720Dina-1 & Tuziluoke
The Dina-1 and Tuziluoke fields, located in the Tarim basin, have been developed by Brightoil Petroleum and PetroChina.
$3,720