Asset Report

Tigzha zinc mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Tighza is a re-start of the Jebel Aouam mine, which was previously worked between 1975 and 1993. Mining restarted in 1996 with ore being exploited from the Signal, Ighrem Aoussar and Sidi Ahmed veins. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Tigzha zinc mine

    XLS 443.50 KB

  • Document

    Tigzha zinc mine

    PDF 1.11 MB

  • Document

    Tigzha zinc mine

    ZIP 1022.44 KB