Asset Report
Tigzha zinc mine
Report summary
Tighza is a re-start of the Jebel Aouam mine, which was previously worked between 1975 and 1993. Mining restarted in 1996 with ore being exploited from the Signal, Ighrem Aoussar and Sidi Ahmed veins. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
San Valentin zinc mine
A detailed production and cost competitive analysis of the Valentin zinc mine.
$2,250
Asset Report
Garpenberg zinc mine
A detailed analysis of the Garpenberg zinc mine.
$2,250
Asset Report
Pomorzany-Olkusz zinc mine
A detailed analysis of the Pomorzany-Olkusz zinc mine.
$2,250