Asset Report
Timok copper mine project
Report summary
This analysis considers the Timok Upper Zone (Cukaru Peki) deposit, located within the Timok Magmatic Complex of eastern Serbia. Zijin Mining acquired Nevsun Resources in 2019, and became the sole owner of the project. The Upper Zone will be developed as an underground mining operation producing a copper-gold concentrate. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250
Asset Report
Udokan copper mine project
A detailed analysis of the Udokan copper mine.
$2,250
Asset Report
Pebble copper mine project
A detailed analysis of the Pebble copper mine project.
$2,250