Asset Report

Timok gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

This analysis considers the Timok Upper Zone (Cukaru Peki) deposit, located within the Timok Magmatic Complex of eastern Serbia. Nevsun Resources plans to develop the Upper Zone as an underground mining operation producing a copper-gold concentrate. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • No table of contents specified

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Timok gold mine project

    XLS 117.00 KB

  • Document

    Timok gold mine project

    PDF 1.23 MB

  • Document

    Timok gold mine project

    ZIP 1.05 MB