The refinery was commissioned in 2013 and has a cathode production capacity of 400kt/a. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Emissions
- Tankhouse
- Casting Plant
Tables and charts
This report includes 4 images and tables including:
- Tongling (Jinguan) Copper Refinery Emission Intensity Quartile Ranking - total global production - tonnes Cu
What's included
This report contains:
Other reports you may be interested in
Asset Report
Tongling (Jinguan) copper smelter
A detailed analysis of the Tongling (Jinguan) copper smelter.
$2,250
Asset Report
Tongling Ausmelt copper refinery
A detailed analysis of the Tongling Ausmelt copper refinery.
$2,250
Asset Report
Tongling (Jinchang) (closed) copper refinery
A detailed analysis of the Tongling (Jinchang) copper refinery.
$2,250