Asset report

Trout Lake copper mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The orebody was discovered in 1976 by Granges Exploration Ltd with development commencing in 1980 and first commercial production in June 1982. Capital cost (mine only) was C$30.3M. The mine was initially accessed by decline only. A shaft to 660m was completed in 1988 with the new crusher and hoisting facilities available for use in 1990. Since the early 1990s mining has progressively switched to long hole open stoping from cut and fill. The mine closed in June 2012.

What's included

This report contains

  • Document

    Trout Lake copper mine

    XLS 516.00 KB

  • Document

    Trout Lake copper mine

    PDF 643.24 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Asset report

Eagle nickel operation

Asset report

LaRonde gold mine

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898