Asset Report
Uralsk (S) aluminium smelter
Report summary
The Søderberg lines were closed in 2009. Uralsk is now an exclusively prebake technology operation. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Alumina Source
- Anode Source
-
Power
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Irkutsk (S) aluminium smelter
A detailed analysis of the Irkutsk (S) aluminium smelter.
$2,250
Asset Report
Jiaozuo Wanfang (S) aluminium smelter
A detailed analysis of the Jiaozuo Wanfang (S) aluminium smelter.
$2,250
Asset Report
China East Grid (S) aluminium smelter
A detailed analysis of the China East Grid (S) aluminium smelter.
$2,250