Asset Report
Valentine Lake gold project
Report summary
The Valentine Lake project is located in the Central Region of Newfoundland and Labrador, Canada. The property is accessed by an 84 km gravel road from the town of Millertown, which can be accessed by the Trans-Canada Highway and the Buchans Highway. A mineral resource is established for four mining zones, including the Marathon deposit, the Leprechaun deposit, the Victory deposit and the Sprite deposit. The Feasibility Study dated April 2021 incorporates only open pit mining techniques, with further drilling needed in order to determine if the deposits are amenable to underground mining. Based on initial findings, only production from the Marathon and Leprechaun have been included in the mine plan.
Table of contents
- Summary
- Key Issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Red Lake gold mine
A detailed analysis of the Red Lake gold mine.
$2,250
Asset Report
New Prosperity (Fish Lake) gold mine project
A detailed analysis of the New Prosperity (Fish Lake) gold mine project.
$2,250
Asset Report
Windfall Lake Gold Mine Project
A detailed analysis of the Windfall Lake Gold Mine Project.
$2,250