Asset report

Vasilkovskoye gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Mine life in the accompanying analysis based on reserves is to 2029 at a plant process rate of around 8Mt/a. Ore is refractory in nature. The Vasilkovskoye mine is a low cost open pit operation. Gold production is around 350 to 440 thousand ounces per annum.

What's included

This report contains

  • Document

    Vasilkovskoye gold mine

    XLS 128.50 KB

  • Document

    Vasilkovskoye gold mine

    PDF 796.76 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898