Asset report

Veduga gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The project will be operated mainly as an open pit operation followed by selective underground mining. Open pit operations will utilise conventional truck and shovel methods and underground mining is expected to use mechanised open stoping methods. Mine life is estimated at 14 years. Processing is expected as a combination of heap leach for oxide ores and a flotation plant to produce a sulphide concentrate for toll treatment.

What's included

This report contains

  • Document

    Veduga Project gold mine

    XLS 125.50 KB

  • Document

    Veduga gold mine project

    PDF 555.14 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898