Asset report

Vladikavkaz zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The history of smelting at this site dates to 1903 when a horizontal distillation plant was built for zinc production using local concentrates. The present plant was built in the early 1930s. In 1956 the roasting plant was converted from multiple hearth roasters to Russian fluid bed roasters. A new acid plant was built in 1975. The design capacity of 107kt zinc has not however been achievable for many years due to equipment deterioration although improvements are in progress (see...

What's included

This report contains

  • Document

    Vladikavkaz zinc smelter

    PDF 1.11 MB

  • Document

    Vladikavkaz zinc smelter.xls

    XLS 538.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in?

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898