Asset report

Volta Grande gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Volta Grande project includes two lateritic and saprolitic gold type deposits, Ouro Verde and Grota Seca. A two phase approached is planned, first one with a processing capacity of 3.5Mt/a of ore and increasing to 7Mt/a by year 3. Conventional open pit mining methods will be used on two deposits and the process flow sheet is relatively straight forward consisting of primary crushing, gravity concentration of coarse gold, carbon in pulp and carbon in leach and recovery of gold by adsorption to produce a gold dore. Over the 18 year mine life, average annual production is 205koz.

What's included

This report contains

  • Document

    Volta Grande Project gold mine

    XLS 121.50 KB

  • Document

    Volta Grande gold mine project

    PDF 605.57 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898