06 September 2019

West Musgrave nickel project

Report summary

Cassini Resources Limited acquired the West Musgrave Project from BHP Billiton in 2014. Cassini paid BHP an initial deposit of A$250,000 for the project along with a 2% smelter royalty. An additional A$10 million would be paid to BHP after the mine has operated for one full year. Cassini released the results of a scoping study in early 2015. This considered two cases, the first a staged ramp-up from 1.5Mtpa to 4Mtpa in the eighth year of operation, and the second a 4Mtpa case. The first case is considered in the accompanying analysis. Cassini expects to release the results of a pre-feasibility study in 2016.

Table of contents

  • Mining
  • Processing

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    West Musgrave nickel project

    XLS 771.50 KB

  • Document

    West Musgrave nickel project

    PDF 933.07 KB

  • Document

    West Musgrave nickel project

    ZIP 1.02 MB

Trusted by leading organisations