Asset Report
Wolf zinc mine project
Report summary
This is a Pb-Zn-Ag mine project. Due to the early stage of the project the assumptions are preliminary in nature. We are assuming an open pit mine with a conventional 1.3kt/d ore flotation plant. The Wolf deposit is located 90km southeast of Ross River in Yukon, 45km west of the Kudz ze Kayah deposit and 65km west of the Wolverine deposit. The property is remote with principal access by helicopter from Ross River. On 23 January, 2017 BMC reported a JORC (2012) compliant inferred mineral resource of 3Mt grading 4.9% Zn, 1.4% Pb and 42g/t Ag.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Pine Point zinc mine project
A detailed analysis of the Pine Point zinc mine project.
$2,250
Asset Report
West Whundo zinc mine project
A detailed analysis of the West Whundo zinc mine project.
$2,250
Asset Report
Admiral Bay zinc mine project
A detailed analysis of the Admiral Bay zinc mine project.
$2,250