Asset Report

Xiangyun Feilong zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

29 November 2018

Xiangyun Feilong zinc smelter

Report summary

The current 100kt/a smelter is the third smelter to be operated by Xiangyun Feilong at this site. It uses a combination of leaching and solvent extraction technology to make slab zinc directly from secondary materials. 

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

  • Key facts: Table 1
  • Detailed maps
  • Participation: Table 1
  • Flowsheet
  • Feed preparation
  • Leaching and Purification
  • Tankhouse, Melting and Casting
  • Production
  • Products: Table 1
  • Products
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Xiangyun Feilong zinc smelter

    PDF 1.08 MB

  • Document

    Xiangyun Feilong zinc smelter.xls

    XLS 411.00 KB