Asset Report
Xiaoshamba bauxite mine
Report summary
The Xiaoshamba mine complex (known as Guizhou #1) comprises the Yinchangpo and Jiujialu mine. Wulongsi was closed in 2012. The mines are captive suppliers to the Guizhou refinery. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
SMB-WAP bauxite mine
The SMB-WAP project started shipments of bauxite to China in H2 2015.
$2,250
Asset Report
Trombetas bauxite mine
A detailed analysis of the Trombetas bauxite mine.
$2,250
Asset Report
Paragominas bauxite mine
A detailed analysis of the Paragominas bauxite mine.
$2,250