Asset Report
Yabulu - Closed nickel operation
Report summary
The Palmer Nickel and Cobalt Refinery has been operating since 1974. In 2013 the plant's owner, Clive Palmer announced plans to spend A$1bn on upgrading the operation, although there has been no indication as to how this will be spent. Production ceased from the Refinery in June 2016 and the company has since been placed into liquidation. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Long - Closed nickel operation
A detailed analysis of the Long nickel operation.
$2,250
Asset Report
Cawse - Closed nickel operation
A detailed analysis of the Cawse - Closed nickel operation.
$2,250
Asset Report
Bucko Lake - Closed nickel operation
A detailed analysis of the Bucko Lake - Closed nickel operation.
$2,250