Asset Report

Yimei alumina refinery

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The refinery was commissioned in 2005 and SGA goes to the Yichuan smelter. Bauxite is is sourced from third parties. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Bauxite
  • Digestion
  • Calcining
    • Red Mud
  • Power

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Yimei alumina refinery

    XLS 122.00 KB

  • Document

    Yimei alumina refinery

    PDF 931.60 KB

  • Document

    Yimei alumina refinery

    ZIP 778.18 KB