Asset Report

Yusheng zinc smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Yusheng zinc smelter began construction of 100kt/a capacity in February 2018 with total investment of RMB 978 million. The smelter commenced trial production in early October 2021 and produce the first batch of refined zinc in November 2021. Due to high operating costs and low profit margins, only one production line (50 kt/a) has been in operation by 2023. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues

Tables and charts

This report includes the following images and tables:

  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Yusheng zinc smelter

    PDF 914.13 KB