Asset report

Zeravshan (Jilau & Taror) gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Mining is predominantly by conventional open pit methods supplemented by underground ore from Jilau Main reserves and low grade stockpiles. Ore is processed in a conventional 3.6Mt/a carbon in leach (CIL) plant and a 2.5Mt/a dump leach facility. The mine produced 68koz of gold in 2014.

What's included

This report contains

  • Document

    Zeravshan (Jilau & Taror) gold mine

    XLS 137.00 KB

  • Document

    Zeravshan (Jilau & Taror) gold mine

    PDF 1.01 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898