Asset Report
Zunyi aluminium smelter
Report summary
The prebake lines at Zunyi were commissioned in 2002 following the closure of the last Søderberg line, which began operation in 1985. The plant includes captive alumina, while power is supplied from the grid. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Alumina Sources
- Anode Sources
-
Power
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains: